Entered this project with the room already gutted to the studs. First order of business is to construct the new shower pan New shower control plumbing Cement board up in the shower Cement board edges taped and sealed. Ready for the waterproofing layer Determining the layout of the pebble shower floor Shower floor in and grouted. You can see the waterproofing layer (red) Vertical running bond pattern looks great but is pretty difficult Tile floor has been installed. Continued up the shower curb. Topped the curb with a marble threshold that will match the threshold into the bathroom Shower nooks and center of control wall have the same accent tiles Maple lined linen closet New casement window Installing the shower door Installing the shower door Shower control trim added Drywall and paint finished. Time to add trim Glamour shot of the new shower New floor, new vanity, existing toilet