Skip to content

  • Home
  • About Us
  • Catherine Project
  • Claredon Project
  • Contact Us
  • Courtney Project
  • Dehaven Project
  • DIY-ers Welcome
  • Gayton Grove Project
  • Hazel Tree
  • Layne Project
  • Refresh
  • Remodel
  • Shane Project
  • Testimonials
  • Update
  • Your Neighborhood Handyman

Shane Project

Original condition of space
Original condition of space
Demo begins of the 12x12 tiles in the shower
Demo begins of the 12x12 tiles in the shower
More shower demo
More shower demo
All the wall tile down!
All the wall tile down!
Shower demo done. The only original thing that will stay in this room will be the tub
Shower demo done. The only original thing that will stay in this room will be the tub
Cement board up and water proofing applied
Cement board up and water proofing applied
First rows of subway tiles installed
First rows of subway tiles installed
Shower tiling down and tub being stripped to prep for reglazing.
Shower tiling down and tub being stripped to prep for reglazing.
Shower completed
Shower completed
Nice border for the subway tiles
Nice border for the subway tiles
Retro hexagonal floor tile installed. Toilet flange had to be reconstructed due to the flange rusting through
Retro hexagonal floor tile installed. Toilet flange had to be reconstructed due to the flange rusting through
shane shoer after
New vanity, new medicine cabinet, new switches and receptacles
New vanity, new medicine cabinet, new switches and receptacles
shane after
Copyright © 2025 — Escapade WordPress theme by GoDaddy